ADA-curb ramps project along SR 116

SR 116 Curb Ramps and Crossing Enhancements at Bodega/Florence and Bodega/Robinson

The sidewalk ramp replacement at the intersection of Wallace St and N Main St is on hold until PG&E relocates an existing electrical facility, which is in conflict with the new sidewalk grade. The new flashing crosswalks at Bodega Ave/Robinson Rd intersection and Bodega Ave/Florence Ave intersection are tentatively scheduled for installation the week of 10/2/23.  All other contract work has been completed. Funding for the project was provided in part by local sales tax Measure M Transportation funds and federal highway transportation grant.

Measure M Sales Tax At Work

Feedback